St. Joe Beach Update #341 min read

Today when when we arrived there was a worker on site who was installing flooring. He had already finished the cabinets even though he said there were still some adjustments which were needed.

We were able to see the counter tops and were very pleased with the builder’s selection. Even though the bathroom counters were cut incorrectly, we were able to get an idea of what it would look like when finished. 

The ceiling fans were hung in all the rooms and all the lights were installed. The exterior lighting had been installed as well; flood lights on the back corners and wall lights by the doors. The HVAC system was installed and it sounded like next week they may be switching from temporary to permanent power. Check out the album Construction #7 for more images.

All of this being said, I think we are still looking at two weeks before we can write up our punch list, another week for them to clear the list, and then a week for us to go back to move stuff in.

Leave a Reply